Recommended planning

Bruce Highway, Gateway Motorway and Gympie Arterial Road interchange plan

Recommended planning for the Bruce Highway, Gateway Motorway and Gympie Arterial Road interchange.


What are Collector-distributor roads?

Collector-distributor roads are built parallel and separate to a main carriageway ─ collecting local traffic and distributing it on the road network and provide extra road space and improve safety by reducing the need for vehicles to weave through highway traffic.

Collector-distributor roads will be constructed either side of the Bruce Highway between the Gateway Motorway/Gympie Arterial Road and Dohles Rocks Road interchange.

Feedback wall: Tell TMR what you think about the recommended planning

Share your thoughts below and vote on other comments (like/dislike). Information provided in this section will be publicly displayed on the feedback wall

19 December, 2023

24567 says:

Where the two highways connect should be 4 lanes each way. Why reduce down to 3 each way just for this section. Everyone will have to merge.

19 December, 2023

Bigalstrathpine says:

Negative comments people Clearly don't commute to work hence not needing to get to work on time. This is a great plan.

19 December, 2023

Bigalstrathpine says:

Do NOT connect the western alternative to the gateway.

19 December, 2023

Bigalstrathpine says:

Push the extra lanes to dbay road Otherwise you're just pushing the merge carpark up further without actually adding capacity.

19 December, 2023

Bigalstrathpine says:

Excellent plan. Please ensure carseldine to the gateway gets an upgrade. The stretch from Strathpine road to gateway is down right dangerous

17 December, 2023

Philbrucehighway says:

The roadworks are giving me mental health issues. We need one lane for signwritten company vehicles to get to jobsites ontime.

17 December, 2023

Philbrucehighway says:

Past 5 years of reduced highway speeds for construction, yet there is never enough lanes. Finish the works and make the speed limit 130km/h.

13 December, 2023

TheBaggerman says:

Make sure the Bruce Highway Western Alternative connection is properly considered and integrated into the design.

5 December, 2023

sextontmr says:

The disappointing part is when all the governments can't stump up the cash and we get the Wish.com version. see: Ipswich Highway Upgrade

5 December, 2023

sextontmr says:

Its good. It should have been built already. This needs an existing provision for future western gateway circling west to the M5 & BHWA

4 December, 2023

mazdajon says:

These major changes look impressive but sadly by the time this is all completed it will be out of date due to the population expansion again

4 December, 2023

sTOne says:

Don't needlessly wipe out more adjacent nature reserves. Don't leave an expensive mess for others to clean up, like every prior upgrade.